Dehumidifier with yellow duct hose beside a wall opened to the studs, water damage scope of work in Attleboro, MA
Home / Blog / How to read a scope of work

How to Read a Water Damage Scope of Work in Attleboro, MA

The scope is the real contract. Read it by rooms, phases and exclusions, and it stops being a wall of jargon.

A scope of work is the list of tasks a contractor agrees to do. It can be one page or twelve. The longer ones are not necessarily better, but they should be organized so you can tell what will happen in each room and in what order.

This page explains how to read a scope. It is general information and not legal advice.

Read by room first

Good scopes are organized by room or area. Each room shows what is wet, what will be removed, what will be dried and what will be replaced. If a scope is a list of generic tasks without rooms, you cannot tell whether the kitchen or the basement is being worked on.

Match each room in the scope to your own photos. If a wet room is missing, say so before signing.

Then read by phase

PhaseTypical contentsWhat to look for
EmergencyStop water, extract, protectStart time and what is removed
DryingEquipment, monitoring, readingsEquipment counts and visit schedule
CleaningSurface cleaning, odor controlWhat is cleaned and with what
RepairDrywall, paint, flooringMaterial grades and who does the work
CloseoutFinal readings, photos, paperworkWhat you receive at the end

If a phase is missing, ask who handles it.

Understand the units

Scopes use units such as square feet, linear feet, days and each. Look at what is measured. Drywall is usually priced per square foot, baseboard per linear foot, and equipment per day. If a unit looks odd, ask what it counts.

Quantities should match the room sizes you know. A scope that claims many more square feet of drywall than the rooms contain deserves a question.

Look for exclusions and allowances

  • Exclusions say what is not included, such as mold, asbestos or lead paint testing.
  • Allowances give a stand-in amount for something not yet known.
  • Conditions say what changes the price, such as hidden damage found when walls are opened.
  • Reservations say what happens if the insurer disagrees with a line item.

Not sure what a line means?

Call and ask the crew to explain it in plain words.

☎ Call (833) 521-1033

A worked example in words

Imagine a scope for a finished basement. Under the living room, it lists extracting standing water, removing carpet and pad, removing the bottom two feet of drywall, setting dehumidifiers and air movers and logging readings for several visits. Under the bathroom, it lists a supply line repair by a plumber, tile cleaning and replacement of a vanity base.

Each room has a start, a middle and an end, and you can tell who does each part. That is the shape of a good scope. If your scope reads as a single paragraph of general tasks, ask the contractor to break it out by room.

Questions to ask when you are ready to sign

  • Which items are allowances and what would change them?
  • Who is responsible for permits, and where are they listed?
  • What documents will I receive at the end of the job?
  • How are change orders requested, priced and approved?

Scope language that deserves a question

Phrases such as as needed, miscellaneous, or per policy can hide real costs. So can a line that lists a quantity without a unit. If you see one, ask what it means in plain words, and ask for it to be written into the scope. You are not being difficult. You are making sure both sides picture the same work.

Ask about hidden damage

Water travels, and a scope written from outside a wall may miss what is inside. A good contractor says what will happen if more wet material is found. Ask whether the price changes, who approves the change and how it will be documented.

Tools like moisture meters and thermal cameras reduce surprises, and the structural drying page explains how they are used.

Check the sequence and dates

A scope should show when work starts and when it should finish, and what must happen before each step. Drying must be verified before walls are closed, and mold work must be finished before rebuilding. The mold remediation page describes the order for contaminated areas.

For multi-unit buildings, such as those in City Center, the scope should state which units are included and how access will be arranged. Older mill-village houses, such as those in Hebronville, often have more than one wall layer, so ask the scope to say how far the opening will go.

Keep the scope with your records

Keep the signed scope, every change order, photos and the drying log in the same folder. They are the record for your insurer and for any later dispute. A change order should be written, dated and signed by both parties.

What to do before you sign a scope

Ask which water category the scope assumes, since ANSI/IICRC S500 defines the categories and they change what must be removed. Ask how drying will be measured and when equipment comes out.

Massachusetts and Attleboro: what a written contract should hold

The Massachusetts Office of Consumer Affairs and Business Regulation lists contract items that map directly onto a scope. These include a detailed description of the work and materials, start and completion dates, the total price, a payment schedule with dates and amounts, and a statement that no work begins until the contract is signed and the owner has a copy.

It also says a contract should include a permit clause saying the contractor must obtain required permits, and that owners who pull their own permits or hire unregistered contractors may lose access to the state Guaranty Fund. The City of Attleboro Building Department can say which permits a repair needs.

Common questions

What is a change order?

A written change to the scope, with its price and dates, signed by both sides. It protects you when hidden damage is found.

Should the scope list equipment?

Yes. It should say what drying equipment will run, how many pieces and for how long, and how monitoring is recorded.

What if the scope excludes mold?

Then mold is handled separately if found. Ask what the contractor will do and how it would be priced.

Where does a permit appear in the scope?

Massachusetts guidance says the contract should require the contractor to obtain required permits. Ask the Attleboro Building Department which apply.

Have a scope to review?

Call and ask the crew to walk through it.