After water damage, owners often ask whether repairs need a permit. The answer depends on the work. Extracting water and running drying equipment are generally not construction. Cutting out walls, replacing plumbing, rewiring or re-roofing are.
This page gives general information and points to the city office that decides. The Building Department, not a restoration company, determines what a permit requires.
The work that usually needs a permit
The City of Attleboro lists permits for additions, renovations, alterations and changes of use, demolition, plumbing for any installation or repair, electrical work, HVAC and mechanical systems, fireplaces and wood stoves, and re-siding, re-roofing and window replacement.
Many water damage repairs fall into one of those groups. Replacing a burst pipe is plumbing, a new circuit is electrical, and a replaced roof section after a storm is roofing.
The work that usually does not
- Extracting water and running dehumidifiers and air movers.
- Moving and protecting contents.
- Cleaning surfaces and applying antimicrobial treatment.
- Cosmetic work such as painting, depending on the scope.
These are common patterns. A repair that crosses into structural work, plumbing or electrical systems changes the answer, so ask the Building Department when in doubt.
Who may pull the permits
In general, licensed trade contractors pull permits for their own work, and registered contractors may pull building permits. The City of Attleboro says that since March 1, 2022 homeowners cannot obtain electrical permits, and only Massachusetts licensed electricians can.
The Massachusetts home improvement rules add that owners who pull their own permits may lose access to the state Guaranty Fund. Ask your contractor who is pulling what.
Not sure where drying ends?
Call and ask which parts of the job are drying and which are rebuilding.
A calm way to find out
Write down the repair in a sentence, such as replacing a section of supply pipe in the basement ceiling and replacing the drywall under it. Call the Building Department with that sentence and ask which permits apply. The staff can tell you whether the work needs a plumbing permit, a building permit or neither.
Ask the contractor the same question and compare answers. A contractor who works in the city regularly usually knows, and a difference between the two answers is worth sorting out before work starts.
Emergency work and permits
Emergency steps such as shutting off water, extracting standing water and starting to dry are urgent and are not the same as construction. If repairs follow, the contractor can arrange permits at that stage. Do not let the paperwork delay drying, because delay is what makes damage grow.
Keeping the permit with your records
When a permit is issued, ask for a copy and keep it with the invoice and the photos. After the work, the inspection sign-off is the document that shows the repair was reviewed. If a contractor says no permit was needed, ask them to write that on the invoice, and confirm with the Building Department if the work involved plumbing, wiring or structure.
A tidy file protects you at the next claim and at a future sale, when a buyer or an inspector may ask what was repaired and who did it.
Why permits matter after a loss
A permit means the work is inspected. That protects the owner, helps an insurer see that repairs met code and leaves a record for a later sale. Skipping a permit can cause problems when the house is sold or when a later claim is made.
Emergency measures such as shutting off water or tarping a roof are usually done first and permitted later when required. Ask the contractor and the Building Department about the order.
Examples around Attleboro
| Repair after water damage | Permit likely? | Who to ask |
|---|---|---|
| Extraction and drying only | Generally not | Restoration company |
| Replacing a burst pipe | Plumbing permit | Licensed plumber |
| Replacing a wet outlet or panel | Electrical permit | Licensed electrician |
| Replacing a storm-damaged roof section | Re-roofing permit | Roofer and Building Department |
| Rebuilding walls and ceilings | May need a building permit | Building Department |
The City of Attleboro makes the final decision on its permits.
Where your property sits does not change the office
Whether the house is in South Attleboro, near Oak Hill or downtown, the City of Attleboro Building Department handles it. Properties just outside the city, such as in North Dighton, fall under their own town's office, so the correct office depends on the address.
The burst pipe page and the ceiling page describe typical repairs that follow drying.
Attleboro: the Building Department
The City of Attleboro Building Department is at 77 Park Street, Attleboro, MA 02703, phone 508-223-2222 ext. 3251. The city says contractors and homeowners apply online, and that applications should be complete to avoid delays. Hours are Monday 8:00 a.m. to 4:30 p.m., Tuesday 8:00 a.m. to 6:00 p.m., Wednesday and Thursday 8:00 a.m. to 4:30 p.m. and Friday 8:00 a.m. to 12:00 p.m.
The city also says inspection requests should not be emailed. Call the office or schedule through your account sign-in.
Common questions
Do I need a permit to dry a flooded basement?
Extraction and drying are generally not construction work. Plumbing, electrical and rebuilding work are on the city permit list.
Can I pull my own permit in Attleboro?
Homeowners can apply for some permits, but the city says only licensed electricians can obtain electrical permits since March 1, 2022.
What happens if I skip a permit?
The work may not be inspected, and the omission can create problems with insurance or a later sale. Ask the Building Department.
Does a property in North Dighton use the Attleboro office?
No. North Dighton is in the town of Dighton, which has its own permitting. Use the office for your address.